PROJECTS

 

New Office Building

New Office Building

Our new office and work area is located at 414 Coast Guard Road in the Venice Port Complex. Come by and visit us!










 

Baptiste Collette

Baptiste Collette Bayou

Baptiste Collette Baptiste Collette Maintenance Re-Dredging

The Army Corps of Engineers has completed maintenance dredging of Baptiste Collette Bayou to a depth of -16 feet MSL as of December 2011.

Baptiste Collette Deepening

The plans to dredge Baptiste Collette Bayou to maintain a depth of 26 feet are progressing well. Plaquemines Parish funded $250,000 for a recon study of the bayou that was presented to Parish President Nungesser and the Parish Council at the end of October 2007. A conservative cost-benefit ratio of 1.4 was determined, a number that well exceeds what the Corps of Engineers requires for consideration. The next step, the feasibility study, that will cost approximately $3 million commenced March 1, 2008. Once this study is complete Fourth Quarter 2011, the results will be presented to the Corps of Engineers for approval and funding of the project.

 


 

Tidewater Road Construction

Tidewater Road Improvements

Plaquemines Parish has completed the widening and raising Tidewater Road to an elevation of +5 feet (MSL) from Highway 23 to Coast Guard Road.

Plaquemines Parish has completed plans to widen and raise Tidewater Road to an elevation of +5 feet (MSL) from Coast Guard Road to Venice Boat Harbor Road. Bids will be advertised in the First Quarter of 2012.

 

 



Tiger Pass

Tiger Pass Maintenance Re-Dredging

The Army Corps of Engineers completed the maintenance dredging of Tiger Pass as of March 1, 2010.












Boothville-Venice Firehouse

Boothville-Venice Firehouse

The new state of the art firehouse in Venice is completed.

Plaquemines Parish firefighters recently cut the ribbons on two new state-of-the-art fire stations in Port Sulphur and Venice. Plans are underway for an open house celebration
to dedicate the new Boothville-Venice fire house to past chiefs Earl Hahnebohm and Ernest “Noonie” Bourgeois. Look for more information on this event in the future.

The Boothville-Venice area, which includes the Venice Port Complex, is protected by a 25-member fire department made up of both paid and volunteer firemen. The six paid, full-time firemen are trained and certified by LSU in the following: Firefighter I, Firefighter II, First Responder, Haz Mat Awareness, Haz Mat Operations and Driver Operator.

All firemen are equipped with new Bunker gear and extrication suits, while the firehouse holds in house hose testers, compressors to fill safe breathing air tanks and confined space rescue equipment.The new fire station includes backup generators and is elevated to protect against future storms.

In addition, trucks are outfitted with a 77 foot ladder, a 65 foot squirt, a hose tender and three pumpers. One mini pumper is set up as a first responder with extrication and EMS equipment.

During an emergency, always call 911. However, for non-emergencies, the fire department can be reached at 504-534-2222.

 




Boothville-Venice Community Center

Boothville-Venice Communtiy Center

Construction has begun on the community center.

 

 

 

 

 

 


 

South Pass

The Army Corps of Engineers has completed plans and specifications for the maintenance dredging of South Pass to a depth of -20 feet (MSL). The Corps is presently seeking funding for this project.

 

 


Bulkhead Replacement Canal #1

The Venice Port Complex has completed construction of an 864 wall feet of Bulkhead along Canal #1 in front of Sites 12, 13 & 14A. The bulkhead was constructed with 70 foot sheet piles. These sites are available for immediate lease.


Venice Marina Road Improvements

Plaquemines Parish is proceeding with receiving final permits for the asphalt overlay of Venice Marina Road from Tidewater Road to Boat Harbor Road. Construction is expected to begin First Quarter 2012.

 




Boothville-Venice Community Center

Bulkhead Replacement Canal #2

The Venice Port Complex replaced 400 wall feet of bulkhead along Canal #2 in front of Site 49. This site is available for immediate lease.

 

 

 

 

 

 




Bulkhead Replacement Grand Pass

The Venice Port Complex replaced 355 wall feet of bulkhead along Grand Pass next to the Chevron Site. This site is available for immediate lease.

 

 

 

 

 

 